Case SharingSeptember 2026

Jiangxi Fuzhou Water Conservancy Camera Power Supply Project

Jiangxi Fuzhou Water Conservancy Camera Power Supply Project

In September 2026, the Jiangxi Fuzhou water conservancy camera project adopted an off-grid PV and energy storage configuration to solve the power supply of monitoring points along the river embankment.

The monitoring points are scattered along the river embankment, far from the utility grid, and the cost of laying power lines was too high for the owner. An off-grid PV and storage system was chosen to power each camera independently.

Each point is equipped with a high-efficiency mono PV panel, an MPPT controller and a LiFePO4 battery sized for several cloudy days, so that the cameras keep recording around the clock.

After commissioning, the system has run stably through the rainy season. Maintenance visits have been reduced to routine inspections, and the owner plans to copy the design to more monitoring points.

Planning a similar project?

Tell us your load and location. We will design the system for you.