Urumqi Sewage Treatment Plant Valve Power Supply Project

Urumqi Sewage Treatment Plant Valve Power Supply Project

In August 2026, the Urumqi sewage treatment valve project used an off-grid PV storage system, adapted to the severe winters and large day-night temperature differences of the region.

The valve stations are located outside the plant and cannot easily be connected to the grid. The owner needed a reliable power source that could work through freezing winters.

Boyang supplied an off-grid PV system with low-temperature rated LiFePO4 batteries and an inverter with wide input range to handle cold starts and long periods of low irradiance.

The system has been running without interruption since installation, keeping valve actuators and communication devices online all year.